The overall processing steps of sewing machinery from raw materials to finished fabrics include six processing links: cloth inspection, cloth spreading, cutting, sewing, ironing, and packaging.
Among them, cloth inspection machines, cloth spreading machines, and cutting machines are pre-sewing equipment, which are mainly responsible for the preparation of sewing materials before sewing.
The ironing machines and packaging machines required after the sewing operation is completed are post-sewing equipment.







